Difference between revisions of "U.S.S. Swasey (1919)"
From The Dreadnought Project
Jump to navigationJump to search (Update officeCapt) |
|||
Line 14: | Line 14: | ||
==Service== | ==Service== | ||
+ | After completing fitting out and sailing to the west coast, ''Swasey'' was assigned to the Pacific Fleet. She arrived at [[Pearl Harbor]] in the fall of 1919. | ||
==Captains== | ==Captains== |
Revision as of 15:10, 3 December 2014
U.S.S. Swasey (1919) | |
---|---|
Hull Number: | DD-273 |
Builder: | Fore River, Squantum Yard[1] |
Laid down: | 27 Aug, 1918[2] |
Launched: | 7 May, 1919[3] |
Commissioned: | 8 Aug, 1919[4] |
Decommissioned: | 10 Jun, 1922[5] |
Mined: | 27 Sep, 1944[6] |
Fate: | as H.M.S. Rockingham |
U.S.S. Swasey was one of one hundred and fifty-six Clemson Class destroyers completed for the U.S. Navy.
Service
After completing fitting out and sailing to the west coast, Swasey was assigned to the Pacific Fleet. She arrived at Pearl Harbor in the fall of 1919.
Captains
See Also
Footnotes
Bibliography