H.M.S. Cæsar (1896): Difference between revisions
From The Dreadnought Project
Jump to navigationJump to search
Simon Harley (talk | contribs) (Made Changes.) |
Simon Harley (talk | contribs) m (HMS Cæsar (1896) moved to H.M.S. Cæsar (1896)) |
(No difference)
|
Revision as of 14:19, 17 November 2008
H.M.S. Cæsar | |
Career | Details |
---|---|
Pendant Number: | P.10 (April, 1918) |
Builder: | Portsmouth Royal Dockyard |
Ordered: | 1893 |
Laid down: | 25 March, 1895 |
Launched: | 2 September, 1896 |
Commissioned: | 13 January, 1898 |
Sold: | 8 November, 1921 |
Fate: | Scrapped in Germany |
General Characteristics | |
Displacement: | 14,560 - 14,890 tons (normal) 15,730 - 16,060 tons (fully loaded) |
Length: | 390 feet |
Beam: | 75 feet |
Draught: | 26 feet 4 inches - 27 feet 6 inches |
Propulsion: | 2 Shaft Triple Expansion, 4,000 shp. 4 Yarrow boilers |
Top Speed: | 18.7 knots |
Range: | 4,700 miles at 10 knots |
Complement: | 673 |
Armament: |
|