Haruna (1913): Difference between revisions
From The Dreadnought Project
Jump to navigationJump to search
Simon Harley (talk | contribs) (Temp.) |
Simon Harley (talk | contribs) (Made Changes.) |
||
Line 9: | Line 9: | ||
|- | |- | ||
|Built By: | |Built By: | ||
|[[ | |[[Kawasaki Dockyard Company, Limited|Kawasaki, Kobe]] | ||
|- | |- | ||
|Laid Down: | |Laid Down: | ||
|[[ | |[[16 March]], [[1912]] | ||
|- | |- | ||
|Launched: | |Launched: | ||
|[[ | |[[14 December]], [[1913]] | ||
|- | |- | ||
|Commissioned: | |Commissioned: | ||
Line 21: | Line 21: | ||
|- | |- | ||
|Sunk: | |Sunk: | ||
|[[ | |[[28 July]], [[1945]] | ||
|- | |- | ||
!colspan="2" align="center" style="color: white; height: 30px; background: orange no-repeat scroll top left;"|General Characteristics | !colspan="2" align="center" style="color: white; height: 30px; background: orange no-repeat scroll top left;"|General Characteristics | ||
Line 38: | Line 38: | ||
|- | |- | ||
|Propulsion: | |Propulsion: | ||
|4-shaft | |4-shaft Brown-Curtis turbines<br>64,000 ihp<br>36 Miyabara boilers | ||
|- | |- | ||
|Speed: | |Speed: |
Revision as of 22:56, 1 February 2009
Haruna | |
Career | Details |
---|---|
Ordered: | 1911 |
Built By: | Kawasaki, Kobe |
Laid Down: | 16 March, 1912 |
Launched: | 14 December, 1913 |
Commissioned: | 19 April, 1915 |
Sunk: | 28 July, 1945 |
General Characteristics | |
Displacement: | 27,500 tons |
Length: | 653 feet |
Beam: | 92 feet |
Draught: | 27 feet 6 inches |
Propulsion: | 4-shaft Brown-Curtis turbines 64,000 ihp 36 Miyabara boilers |
Speed: | 27 knots |
Range: | 10,000 nautical miles at 14 Knots |
Complement: | 1,221 |
Armament: | Eight × 14-inch 45 calibre guns Sixteen × 6-inch 50 calibre guns Sixteen × 14-pdr guns |