Shakespeare Class Flotilla Leader (1917): Difference between revisions

From The Dreadnought Project
Jump to navigationJump to search
(setting DEFAULTSORT to 'Shakespeare')
(adding data block outlining 5 ships)
Line 56: Line 56:


{{CatClassUKFlotillaLeader}}
{{CatClassUKFlotillaLeader}}
<!-- data
nat=UK
cat=FlotillaLeader
type=flotilla leader
{ship
name=Shakespeare
pend=
builder=
order=
laid=
launch=1917
comm=
}
{ship
name=Spenser
pend=
builder=
order=
laid=
launch=1917
comm=
}
{ship
name=Wallace
pend=
builder=
order=
laid=
launch=1918
comm=
}
{ship
name=Keppel
pend=
builder=
order=
laid=
launch=1920
comm=
}
{ship
name=Rooke
pend=
builder=
order=
laid=
launch=1920
comm=
}
data -->

Revision as of 20:09, 14 August 2012

Seven flotilla leaders of the Shakespeare Class were ordered late in the war, but only two were completed by the end of hostility and two were cancelled.

Machinery

Generators

In 1916, it was stated that flotilla leaders have two 26.25 kw dynamos arranged in parallel with an additional 9 kw oil-fired set for emergency use.[1] It is likely that this applied to this class.

Armament

Guns

Torpedoes

Fire Control

Rangefinders

Evershed Bearing Indicators

Gunnery Control

Control Positions

Control Groups

Directors

Main Battery

Secondary Battery

Torpedo Control

Transmitting Stations

Dreyer Table

These ships had no fire control tables.[2]

Fire Control Instruments

See Also

Footnotes

  1. Annual Report of the Torpedo School, 1916, p. 120.
  2. absent from list in Handbook of Capt. F.C. Dreyer's Fire Control Tables, p. 3.

Bibliography

  • Admiralty, Gunnery Branch (1910). Handbook for Fire Control Instruments, 1909. Copy No. 173 is Ja 345a at Admiralty Library, Portsmouth, United Kingdom.
  • Template:BibUKDreyerTableHandbook1918

Template:Shakespeare Class (1917)


Template:CatClassUKFlotillaLeader