Difference between revisions of "Pearl Class Cruiser (1889)"
From The Dreadnought Project
Jump to navigationJump to search (Created page with "The 9 third class cruisers of the '''Pearl Class''' were completed in 1891 and 1892. ==Fire Control== ===Rangefinders=== ===Evershed Bearing Indicators...") |
m |
||
Line 30: | Line 30: | ||
==See Also== | ==See Also== | ||
− | *[http://en.wikipedia.org/wiki/ | + | *[http://en.wikipedia.org/wiki/Pearl_class_cruiser Wikipedia] |
==Footnotes== | ==Footnotes== |
Revision as of 22:44, 2 March 2012
The 9 third class cruisers of the Pearl Class were completed in 1891 and 1892.
Fire Control
Rangefinders
Evershed Bearing Indicators
Gunnery Control
Control Positions
Control Groups
Directors
Main Battery
Secondary Battery
Torpedo Control
Transmitting Stations
Dreyer Table
These ships had no fire control tables.[1]
Fire Control Instruments
See Also
Footnotes
- ↑ absent from list in Handbook of Capt. F.C. Dreyer's Fire Control Tables, p. 3.
Bibliography